This College Louise Wegmann project consisted of installing a new boiler room and controller at the Bchemoun site. The outdoor heating piping was also replaced as part of the phase one works.
The project supported the heating infrastructure of an educational facility through targeted mechanical upgrades.
Major Systems
New boiler room, controller, and outdoor heating piping replacement.